Back

Greater Changhua 2b and 4 Offshore Wind Farms: All Cables Installed and Energized

Source: Indexbox

Published:

<p>All inter-array cables for the 920 MW Greater Changhua 2b and 4 offshore wind farms off Taiwan have been installed and are now live. The 42 turbines in the second phase, the 583 MW Greater Changhua 4, are all linked to Taipower's grid and actively producing electricity.</p> <p>Orsted communicated

Read original article

Loading article...

Article not found