Skip to content
Antora Energy

Antora Energy

www.antora.com • November 24, 2026

Antora’s thermal batteries store energy as heat in blocks of solid carbon, delivering always-on heat and power to industry, data centers, and the grid.

Trusted material with centuries of industrial use in high-temperature environments

Unmatched thermal conductivity, best-in-class heat capacity, and simple radiative heat transfer

The fourth-most produced industrial material on Earth, at 1/10th the cost of Lithium-ion

Stores four times as much energy as electrochemical batteries with the same volume

1 RAPID CHARGING WHEN ELECTRICITY IS CHEAP Electricity is used to resistively heat the carbon blocks. Carbon's high thermal conductivity enables ultra-fast charging that rapidly soaks up the cheapest hours of electricity generation.

RAPID CHARGING WHEN ELECTRICITY IS CHEAP

Electricity is used to resistively heat the carbon blocks. Carbon's high thermal conductivity enables ultra-fast charging that rapidly soaks up the cheapest hours of electricity generation.

2 MULTI-DAY THERMAL STORAGE The carbon blocks store energy at temperatures up to 2,400°C in a compact and modular system. These ultra-high temperatures enable our system to serve continuous industrial demand for days on end.

MULTI-DAY THERMAL STORAGE

The carbon blocks store energy at temperatures up to 2,400°C in a compact and modular system. These ultra-high temperatures enable our system to serve continuous industrial demand for days on end.

3 ALWAYS-ON HEAT & POWER At these glowing-hot temperatures, the carbon blocks transfer energy as light. This eliminates the need for complex and maintenance-intensive mechanical systems. Energy is discharged around the clock as heat, which is then delivered to industrial processes or paired with off-the-shelf steam turbine equipment to deliver the fastest firm power solution.

ALWAYS-ON HEAT & POWER

At these glowing-hot temperatures, the carbon blocks transfer energy as light. This eliminates the need for complex and maintenance-intensive mechanical systems. Energy is discharged around the clock as heat, which is then delivered to industrial processes or paired with off-the-shelf steam turbine equipment to deliver the fastest firm power solution.

Heat - To - Power Technology

In future products, Antora is integrating power conversion directly into the thermal battery system. Antora’s thermophotovoltaic (TPV) technology converts light from the hot carbon blocks into electricity with no moving parts.

MODULAR DESIGN TO SERVE LOADS OF ANY SIZE

Antora’s factory-made thermal batteries flexibly scale to match the energy needs of any industrial facility.

Carbon is a time-tested industrial material with no risk of thermal runaway.

Always-on heat and power for operations where downtime is not an option.

Modular, factory-built system minimizes site disruption and streamlines installation.

DECADES-LONG LIFESPAN

DECADES-LONG LIFESPAN

20+ year system lifetime with no cycling degradation.

LET'S TALK WHAT ANTORA CAN DO FOR YOUR BUSINESS.

The full story

This article is one source in a clustered incident — the cluster page carries the summary, timeline and every other outlet covering it.

Data centers turn to on-site gas plants as grid connection delays and transformer shortages grow Data center developers are increasingly building behind-the-meter gas power plants to bypass grid connection waits that can last up to a decade, with Technologyreview reporting over 100 such plants announced in the US totaling more than 115 GW as of October 2026 per Cleanview data. Better Data Center Project estimates 177 GW of planned BYOP gas capacity and analyzes Anthropic's compute commitments, estimating 87% of its power would come from gas and 11% from coal by 2028, with no direct US renewable commitments identified. Better Data Center Project's estimates for Anthropic's 2028 emissions range from 17 to 38 million MtCO2e per year, with a mid-case of 32 million. Johns Hopkins researchers, as reported by Popular Mechanics, warn that transformer and converter shortages could bottleneck grid expansion, with copper projected to run short in 2027. TechCrunch reports that G2 Venture Partners advocates solar paired with long-duration storage as an alternative for off-grid data centers, a view from an investor rather than independent analysis. Yale Climate Connections reports that the NAACP is suing xAI under the Clean Air Act over a gas plant serving its Memphis data center, and that suit is ongoing. Taken together, the articles describe a trend toward fossil-fueled on-site generation, with the emissions figures coming from a single advocacy-oriented analysis and the reliability and availability figures from industry and academic sources. 4 sources 37

Extracted Entities

Companies (1)