Data size
975.9 MB
Posted
Aug 7, 2026
Countdown
Countdown until T1 releases; later stages unlock on schedule.
Country
US
Industry
Other
Summary
Written by ThreatClusterfrom site fields, victim profile, leak post, screenshotHelix claims Highwoods Properties’ data has been leaked in staged packages (T1–T4) for SharePoint libraries and related data. The leak page shows a countdown to release, with a timer reading 00 Days 00 Hours 00 Mins 00 Secs and notes that later stages unlock on schedule. SharePoint is the platform named on the leak page.
Describes what the group claims on its leak site. A listing is not confirmation that a breach occurred.
Victim profile
- Platforms
- SharePoint
What was taken
Highwoods Properties. This listing is closed.
Data categories
SharePoint libraries
File types seen
zip × 11
Sample files (11)
Other_Small_Sites_T1/part-001.zip
Other_Small_Sites_T2/part-001.zip
Mailbox_Attachments/part-001.zip
Mailbox_Emails/part-001.zip
Other_Small_Sites_T3/part-001.zip
Rtp_Development_Documents/part-001.zip
NashvilleMarket_Property_Management/part-001.zip
NashvilleMarket_Marketing/part-001.zip
NashvilleMarket_Construction/part-001.zip
Propmgmt_Energy_Insight/part-001.zip
NashvilleMarket_Properties/part-001.zip
Also stated on the leak page
Fields this group publishes that do not map to a standard column. Labels are the site's own.
- label
- Countdown until T1 releases; later stages unlock on schedule.
- value
- Countdown until T1 releases; later stages unlock on schedule.
- Tier order
- Least → most sensitive: T1 Least → T2 Low → T3 High → T4 Most.
- Stage packages
- SharePoint libraries · T1 (least) → T4 (most). Stage packages unlock when each timer hits zero.
- Stage progression
- T1 (least) → T4 (most). Stage packages unlock when each timer hits zero.
- countdown_display
- Countdown until T1 releases; All stages unlocked; Stage packages unlock when each timer hits zero.
- All stages released
- Yes
- countdown_description
- Countdown until T1 releases; later stages unlock on schedule.
- Least → most sensitive
- T1 Least → Low → High → Most
- Classified package status
- Classified package ready
- Least → most sensitive:
- T1 Least → T2 Low → T3 High → T4 Most.
- Stage packages unlock when each timer hits zero.
- on_page
- Inventory visible and downloads follow each stage
- Entra + inventory visible; downloads follow each stage.
- SharePoint libraries · T1 (least) → T4 (most).
- Stage packages unlock when each timer hits zero.
- Entra + inventory visible; downloads follow each stage.
- on_page
- Countdown until T1 releases; later stages unlock on schedule.
- page text
Leak-site images (1)
Images from the victim's leak listing. Thumbnails scraped from the onion page are blurred by default — click a thumbnail to view.
ThreatCluster capture