CRP Subsea Wins Cable Protection Contract for East Anglia Two Offshore Wind Farm

CRP Subsea Wins Cable Protection Contract for East Anglia Two Offshore Wind Farm

First seen 27 May 2026, 20:10 UTC Offshorewind.BizOedigital 95% similarity 3.1

Article Content

Browse articles
ThreatCluster

CRP Subsea has secured a contract from Seaway7 to supply 142 NjordGuard cable protection systems for the East Anglia Two offshore wind farm, part of ScottishPower Renewables' East Anglia Hub. These systems are designed to protect inter-array cables from over-bending, abrasion, and fatigue during installation and operation. The NjordGuard systems will be manufactured in north-west England, with project engineering already underway and final deliveries expected by February 2027. East Anglia Two will feature 64 Siemens Gamesa SG 14-236 DD wind turbines, generating a total capacity of 960 MW. The project is located approximately 46 kilometers off the coast of Lowestoft and is part of a larger initiative that includes East Anglia One North and East Anglia Three.

Key Points: • CRP Subsea will supply 142 cable protection systems for East Anglia Two offshore wind farm. • The NjordGuard systems protect cables from damage during installation and operation. • East Anglia Two is part of a larger offshore wind development with a total capacity of 2.9 GW.

ThreatCluster AI

Timeline

2024-01-01
Seaway7 secures transport and installation contract
Seaway7 was contracted for the transport and installation of inter-array cables for East Anglia Two.
Offshorewind.Biz
2025-01-01
Hellenic Cables contracted for inter-array cables
Hellenic Cables was contracted to supply inter-array cables for the East Anglia Two project.
Offshorewind.Biz
2026-05-27
CRP Subsea announces contract win
CRP Subsea announced securing a contract to supply cable protection systems for East Anglia Two offshore wind farm.
Oedigital

Community

Browse all →