Oedigital
CRP Subsea Wins Cable Protection Contract for East Anglia Two Offshore Wind Farm
Ask AI about this cluster
Analyzing cluster data...
Referenced clusters:
Something went wrong. Please try again.
Cluster AI
Ask questions about this threat cluster with AI-powered analysis.
Get Researcher $29.99/moArticle Content
CRP Subsea has secured a contract from Seaway7 to supply 142 NjordGuard cable protection systems for the East Anglia Two offshore wind farm, part of ScottishPower Renewables' East Anglia Hub. These systems are designed to protect inter-array cables from over-bending, abrasion, and fatigue during installation and operation. The NjordGuard systems will be manufactured in north-west England, with project engineering already underway and final deliveries expected by February 2027. East Anglia Two will feature 64 Siemens Gamesa SG 14-236 DD wind turbines, generating a total capacity of 960 MW. The project is located approximately 46 kilometers off the coast of Lowestoft and is part of a larger initiative that includes East Anglia One North and East Anglia Three.
Key Points: • CRP Subsea will supply 142 cable protection systems for East Anglia Two offshore wind farm. • The NjordGuard systems protect cables from damage during installation and operation. • East Anglia Two is part of a larger offshore wind development with a total capacity of 2.9 GW.